Skip to content

Bathroom Remodeling in East Village, NY.

A bathroom that finally feels like the rest of your home.

Full bathroom remodels in East Village and Manhattan - quality results, controlled mess, and a written quote in 48 hours.

5.0from 12 Google reviews
Bathroom Remodeling - completed Manhattan project
About this service

A bathroom remodel doesn't have to mean weeks of tearing your home apart. We've done full bathroom renovations in occupied homes across East Village and the rest of Manhattan - sealing off the work area, protecting the floors, and getting in and out cleanly.

Most bathrooms in this market are tight: pre-war condos, brownstones, walk-ups. Smart layout changes - moving a vanity, removing a soffit, switching from tub to walk-in shower - can completely transform what the room feels like. We design with that in mind.

Working in East Village or one of nine other Manhattan cities? We’ve done bathroom work in all of them. Curious how we run a job site? Read our story.

Scope of Work

What a bathroom remodel with us includes

Quoted to your specific scope. A typical full bathroom remodel breaks down into these phases:

  1. Phase 01

    Tear-out and waterproofing

    • Demolition of existing fixtures, tile, vanities and flooring
    • Substrate prep and waterproofing (Schluter, Kerdi, HardieBacker)
  2. Phase 02

    Plumbing and electrical

    • Plumbing updates - relocations for shower, vanity, toilet, water lines and drains
    • Electrical to current code (GFCI outlets, exhaust fan venting, lighting)
  3. Phase 03

    Tile and finish surfaces

    • Tile installation - floor, shower walls, accent walls, custom patterns
    • Vanity, mirror, and lighting installation
    • Fixture installation (faucets, shower systems, toilets, towel bars)
  4. Phase 04

    Custom shower and features

    • Custom shower builds - frameless glass, niches, benches, linear drains
    • Bathtub-to-shower conversions
  5. Phase 05

    Permits and sign-off

    • Permits and inspections, including East Village city permits
    • Final walk-through and punch list
Our Process

How a bathroom project actually goes

  1. Step 01

    Free in-home consultation

    We come measure, look at what's possible, and talk through your goals - bathtub to shower, layout change, second sink, accessibility upgrades. 30 minutes.

  2. Step 02

    Written quote within 48 hours

    Itemized, fixed-price quote - every fixture, every tile, every line item. We commit to the price before work starts. Miss the 48-hour deadline? Take $250 off your project.

  3. Step 03

    Selections walk-through

    We help you pick tile, vanities, fixtures, and finishes. From any supplier - IKEA to custom local fabricators. We're honest about what holds up and what doesn't.

  4. Step 04

    Permits and prep

    We pull every permit East Village requires (plumbing, electrical, sometimes structural). We seal off the work area and protect floors and doorways before demo.

  5. Step 05

    Build, inspect, sign off

    Daily updates. Site cleaned every evening. Final walk-through together - we fix every punch-list item before final payment.

Honest Pricing

What does a bathroom remodel cost in East Village?

Typical Range

$12,000 – $40,000+

A vanity-and-tile refresh in a small powder room can land around $12–18k. A full master bath gut with custom shower, frameless glass, marble tile and high-end fixtures runs $30–40k+. The biggest cost variables are tile quality, fixture grade, and whether you're moving plumbing. We give you a real fixed price in the written quote.

From the founders

Our team came out of the hotel industry - where bathrooms get judged the second a guest walks in. We bring the same standard to your home: clean grout lines, level fixtures, no overspray, no cracked tile, and a final walk-through where every detail gets checked.

Recent Bathroom Work

Real bathroom projects in Manhattan

  • Bathroom Remodeling - East Village master bath, frameless walk-in shower, marble
  • Bathroom Remodeling - Lower East Side condo, full gut, floating vanity
  • Bathroom Remodeling - NoHo brownstone, claw-foot tub restoration + retile
  • Bathroom Remodeling - East Village powder room, pattern tile floor, custom mirror
Verified Google Review
Recently had my bathroom remodeled — new tile, vanity, faucet, mirror, and a few other upgrades. Everything turned out great and I'm really happy with the result. Quality of work was excellent and the space looks completely transformed. Highly recommend.
Christopher Caldwell8 months agoRead all 12 reviews on Google →
FAQ

Questions East Village homeowners ask before booking

How long does a bathroom remodel take in East Village?
Most bathroom remodels run 2 to 4 weeks of on-site work. A simple refresh (vanity, tile, fixtures) can finish in 10–14 days. A full gut with custom shower, plumbing relocations, and tile work usually takes 3–4 weeks. You get a written schedule before we start.
Do you handle the permits?
Yes. Plumbing and electrical changes in East Village require permits, and we pull every one. Cost and scheduling are built into your quote. For occupied buildings (condos, co-ops), we also coordinate with your building's management.
Can I still use my home during a bathroom remodel?
Yes - most clients stay in their home. If it's a full gut and you only have one bathroom, we work fast and try to get the toilet and shower functional within the first week. We seal off the work area to control dust.
Can you convert my bathtub to a walk-in shower?
Yes - this is one of our most-requested jobs in East Village. Tub-to-shower conversions usually take 7–10 days. We rough in a new drain, build the shower curb or curbless threshold, waterproof properly, then tile and install the glass.
What does a bathroom remodel cost in East Village?
Most bathroom remodels in East Village and Manhattan land between $12,000 and $40,000. The big variables are tile selection, fixture quality, custom shower glass, and plumbing relocations. We quote fixed price in writing within 48 hours of the consultation.
Do you handle waterproofing properly?
Yes. We use Schluter, Kerdi, or HardieBacker depending on the job - never just greenboard. Waterproofing failure is the #1 cause of expensive callbacks in this market, so we don't cut corners on substrate.
Get a Free Quote

Ready to start your bathroom project?

Free in-home consultation. Written, fixed-price quote within 48 hours — or we take $250 off your project.

We answer 7 days · Licensed & insured · Manhattan, NY

CallGet a Free Quote